Main Implemented Projects

2023

1
Pilot-scale study of an anti-icing compound for treating railway gondola cars, including the development of a treatment unit for use at the Molodezhny open-pit mine of Kazakhmys Coal LLP (2023)

Customer:

Molodezhny open-pit mine, Kazakhmys Coal LLP

Contractors:

STU-ENGINEERING Scientific and Technical Center jointly with MRG LLP (Karaganda)

Key Results / Supporting Materials:

  • • Pilot-scale unit for treating the sides and bottoms of railway gondola cars
    Link to the material
  • • Experimental program for pilot-scale testing of a unit designed to treat the sides and bottoms of railway gondola cars with anti-icing fluid
  • • The report is registered with the National Center of Science and Technology Evaluation JSC

2024

2
Development of the Information System “Vehicle Counting Using a Video Source” (2024)

Customer:

In-house development initiative

Contractors:

STU-ENGINEERING Scientific and Technical Center

Key Results / Supporting Materials:

2025

3
Monitoring of the Karaganda Agglomeration Transport System and Development of the Transport System Development Concept through 2030 (2024–2025)

Customer:

State Institution “Department of Passenger Transport and Highways of the Karaganda Region,” Karaganda Regional Akimat

Contractors:

STU-ENGINEERING Scientific and Technical Center

Key Results / Supporting Materials:

  • • Concept for the Development of the Karaganda Agglomeration Transport System through 2030
    Link to the material
  • • The report is registered with the National Center of Science and Technology Evaluation JSC
  • • Information System “Determining Traffic Flow Intensity on the Roads of the Karaganda Agglomeration Depending on Changes in Traffic Flows”
    STU-ENGINEERING Scientific and Technical Center jointly with programmers from People&Software LLP (Karaganda)
  • • Information System “Calculation of Fares for Existing Interdistrict (Intercity and Intraregional) Routes of the Karaganda Agglomeration”
    STU-ENGINEERING Scientific and Technical Center jointly with programmers from People&Software LLP (Karaganda)
  • • Information System “Analysis of Traffic Flow Intensity on the Roads of the Karaganda Agglomeration”
    STU-ENGINEERING Scientific and Technical Center jointly with programmers from SMART ANALYTICA LLP (Astana, Astana Hub)

2026

4
Social Project – QANYSH ZHOLY Academy of Young Researchers

Customer:

Akimat of the Bukhar-Zhyrau District, Karaganda Regional Akimat

Contractors:

STU-ENGINEERING Scientific and Technical Center jointly with universities and institutes of Karaganda
STU-ENGINEERING Research Institute

Key Results / Supporting Materials:

5
Development of a Pedestrian Overpass in Karaganda (at the Intersection of Bukhar Zhyrau Avenue with Molokov and Kosmonavtov Streets)

Customer:

State Institution “Department of Passenger Transport and Highways of the Karaganda Region,” Karaganda Regional Akimat

Contractors:

STU-ENGINEERING Research Institute

Key Results / Supporting Materials:

  • • Conceptual design of a pedestrian overpass in Karaganda (at the intersection of Bukhar Zhyrau Avenue with Molokov and Kosmonavtov Streets)
6
Development of an Overpass Project on Gogol Street in Karaganda, Spanning a Road and a Railway Line

Customer:

State Institution “Department of Housing and Utilities, Passenger Transport and Highways of the City of Karaganda,” Akimat of the City of Karaganda

Contractors:

STU-ENGINEERING Research Institute

Key Results / Supporting Materials:

  • • Conceptual design of the overpass on Gogol Street in Karaganda